Create Repair Shop Order for Assembly Shop Order Component
Explanation
To create a repair shop order for a component issued to an assembly shop order, select the material line and
click Create Component Repair Order. In the Create Component Repair Order assistant,
leave Create External Service Order cleared.
The repair quantity may equal or be less than the total issued quantity on the assembly shop order material
line. The quantity specified will be unreserved from the assembly shop order component material allocation and
reserved to the new repair shop order. No other material allocations or operations are created automatically. Any
additional material or operations must be created manually. Processing of the repair shop order is normal. Upon
receipt of the material on the repair shop order, the material will be reserved back to the assembly shop order
material allocation line that originated the repair shop order. Pegging of the repair shop order can be referenced
by the Interim Order for the work scope.
Prerequisites
- An assembly shop order with issued material.
System Effects
As a result of this activity:
- A repair shop order will be created for the material allocation line specified with the component material as
the manufactured part.
- A material allocation on the repair shop order will be created for the same material as the component
material.
- The assembly shop order material allocation for the component material will have unissued the quantity that
is specified to be repaired. This specified quantity will be the lot size for the repair shop order. It will also
be the material allocation quantity for the component material allocation.
- The repair shop order will have reserved the repair quantity to the material allocation line.
- The repair shop order is pegged to the interim order structure.
- Processing of the repair shop order is normal. Upon receipt, the material is reserved back to the assembly
shop order component material allocation line.
- The repair shop order will be closed automatically with the reset of the MRO shop orders in the work
scope.