Sequence Shop Order Operations

Explanation

This activity is used to schedule shop order operations in sequence after each others from a given start date/time and to minimize the total setup time.

To perform this activity from the:

To perform this activity from the Machine Operations Scheduling chart:

In the first assistant step, enable the Include option for the operations so sequence. Optionally, enter an Operation Priority for the operations.

In the second assistant step:

Prerequisites

System Effects

  1.  Priority and Sort Order defined in the Characteristics for Sequence Order list.
  2.  Operation Priority defined in Operations to Sequence list. Operations with a lower value are scheduled before operations with a higher value.
  3.  Operation original Planned Start Date/Time. Operations with an earlier original planned start date/time are scheduled before operations with a later start date/time.