Enter Rate by Period

Explanation

Use this activity to enter the rate by period for a Master Schedule Level 1 part. Rate by period is defined per Material Planning Scenario, so each scenario can hold its own periods and rates for the same part. The records are entered on the Master Schedule - Rate By Period page, or on the Rate by Period tab on the Master Schedule by Part page, which shows the records of the part and the Material Planning Scenario selected on the page.

Rate by period cannot be defined for project MS parts. The Rate by Period tab is not available if the part is connected to a project PNG.

Prerequisites

System Effects