Use this activity to analyze aggregated machine operation loads for a selected Material Planning Scenario on the Aggregated Planning Scenario - Machine Load page. The page displays machine load, capacity, and load percentages for work center resources over the planning periods defined by the selected Period Template on the Period Template Maintenance page for the site.
You can review scenario 1 (the live scenario) as well as simulation scenarios. For simulation scenarios, the Total Load in Scenario 1 and Total Load - Total Scenario 1 Load columns allow you to compare the aggregated load against scenario 1 for the respective period and easily identify positive or negative deviations. These columns are blank when scenario 1 itself is aggregated.
No system effects.