Use this activity to analyze the machine operation loads or labor operation loads generated for a specific
resource, work center, production line, department, or labor class.
MRP, MS Additional, and PMRP load sources, which originate from
supply proposals generated through MRP, Master Scheduling, and PMRP respectively, are the only load sources
modified using the CRP Simulation. All other load sources are displayed directly from the live CRP execution
tables.
No system effects.