Contractor Capacity Control enables service organizations to regulate how work is distributed to contractors by defining limits on the number of tasks that can be assigned within a defined weekly period. It ensures that contractors are not over-allocated and that assignment decisions reflect realistic execution capability.
Contractor Capacity represents the maximum amount of work a contractor can be awarded within a defined period by the Contractor Selection Rules. In contractor management, capacity is defined as a job-based limit, meaning that each assigned task contributes towards the contractor’s consumed capacity. Capacity is always evaluated over a fixed weekly period and is defined as a limit by Service or Service Type. For example, a contractor may have a capacity of 10 Install jobs per week and 20 Repair jobs per week.
The capacity limits applicable to each contractor can be defined on the Service Contractor > Settings page.
Capacity control is applied during the contractor selection and assignment process. When eligible contractors are evaluated for a task, the system checks the contractor’s remaining capacity within the relevant weekly capacity period. A weekly capacity period is always defined by the ISO week date system (ISO 8601) and runs from Monday 00:00 - Sunday 23:59.
This evaluation includes:
During assignment, capacity influences contractor selection as follows:
For Pool rules that use Broadcast to All, remaining capacity is checked when a contractor accepts (when the work is awarded). Sending the offer doesn’t consume capacity. See About Pool Selection Rules.
This behavior ensures that assignment decisions align with the contractor’s ability to execute the work.
Using Contractor Capacity Control provides the following benefits:
Capacity control is useful in scenarios where: