Create New Work Package (Hangar Maintenance)

Explanation

Use this activity to create a new hangar (heavy) work package in CAMO when no suitable package exists for a planned check, or for unassigned tasks and faults that need to be packaged into a check. The Hangar Planner creates the work package and can schedule it in the same flow.

A hangar work package is created with the Create Work Package assistant. In the first step you choose the Work Package Type. Select Heavy Maintenance for a hangar check.

The assistant is opened from several CAMO pages, depending on what you are packaging:

For an overview of the work package lifecycle, see About Hangar Maintenance Work Packaging.

Prerequisites

Procedure

  1. Open the Create Work Package assistant from the relevant CAMO page.
  2. Under Select Your Option, set Select the Work Package Type to Heavy Maintenance.
  3. Under Work Package Details, enter the Name, and optionally select Service Type(s), Work Type(s), a Sub Type, a Doc Reference, and a Description.
  4. Select Next. The work package is created.
  5. On the Scheduling Details step, either schedule the work package now or finish without scheduling:
    • To schedule now, turn on Only Show Capable Locations and select the Work Location, then set Scheduled Start and Scheduled End. The Scheduled Duration (Hours) is calculated automatically. Add a Description if required, then select Finish.
    • To finish without scheduling, complete the assistant and choose to navigate to the new work package. You can schedule it later. See Schedule Work Package (Hangar Maintenance).

System Effects