Certify completed work on tasks

When you are certifying work that is completed on tasks—usually by someone else, verify that the work was done, and certify it in Maintenix before the labor row(s) are complete.

  1. Go to the Task or Fault Details page, Task Execution tab.
  2. Select a labor row.
  3. Click Review Work Captured.

    In the Review Work Captured page, verify the information as needed and click Close.

  4. Click Certify.
  5. If prompted, enter your password and click OK.
  6. On the Certify Work page, provide the required information. Note the following:
    • If you want to add quick text, in the Notes area, select an option from the Predefined Actions list, and then edit the text in the Action field (if required).
    • Independent Inspection Required: If the work done for the labor row does not currently require an additional inspection, but you feel one is required, select the check box.
    Note: If step skills are added to the job card, at this point, you cannot change the step skill status. If you want to do so, you must leave the Certify Task page, and edit the Work Capture page before certifying the task.
  7. Click OK.