Set yields and durations for blocks and requirements in long range plans
- In LRP, click Setup > Block/Requirement.
- On the Block/Requirement List page, double-click a block/requirement row.
- On the Block/Requirement Details page,
in the Scheduling Information area, provide the required information. Note the following:
- Minimum Yield: Enter the minimum planning yield as a percentage.
- Maximum Yield: Enter the maximum planning yield as a percentage.
- Default Duration: Enter the number of days and hours required to complete the block/requirement.
- Click OK.
- With the long range plan open in LRP, click File > Save. If this is the first time saving the plan, you will be prompted to name it.
- Click OK.