Modify the scheduled dates and location of a work package

You can change the scheduled location for a work package on the Gantt chart. You cannot drag a work package from Overflow to a maintenance location.
  1. To modify the scheduled start and end dates of a work package, in LRP, on the Gantt chart, click and drag the work package to the left or right.
  2. To modify the location of a work package, in LRP, on the Maintenance Line View, click and drag your work package up or down to another location. The duration of the work package is updated based on the capacity of the new location.