A work package is placed in the overflow
section of the Gantt chart when automation could not schedule it to a location. Ad hoc
work packages are automatically placed in overflow. Overflow is organized by aircraft
type. You can move a work package from overflow to a specific location manually, but you
cannot click a drag a work package from overflow to a location on the Gantt
chart.
On the Gantt chart, double-click a work package.
Select the Workscope tab.
In the Scheduling Information area,
Location list, select a location.
Note: To move a scheduled work package to overflow, leave the
Location list empty.