Skip to content

Project Delivery (PDMPRO)

The purpose with this page is to provide information related to Project Delivery (PDMPRO) which is obsoleted from IFS Cloud 21R2 onwards.

The existing database tables of PDMPRO are archived with the prefix ''Pd_''.

Followings are the list of names of the archived tables against the original name of the obsoleted tables in PDMPRO component.

Original Table Name Archived Table Name
Activity_Require_Info_Tab Pd_Act_Require_Info_Tab
Distribution_Part_Template_Tab Pd_Dist_Part_Template_Tab
Eng_Part_Master_Serial_Tab Pd_Eng_Part_Master_Ser_Tab
Material_Procurement_List_Tab Pd_Mat_Procurement_List_Tab
Pdmpro_Std_Planned_Cost_Tab Pd_Std_Planned_Cost_Tab
Procured_Material_Tab Pd_Procured_Material_Tab
Project_Function_Part_Tab Pd_Pj_Function_Part_Tab
Project_Function_Tab Pd_Pj_Function_Tab
Project_Part_Definition_Tab Pd_Pj_Part_Definition_Tab
Project_Prod_Str_Temp_Tab Pd_Pj_Prod_Str_Temp_Tab
Project_Product_Cost_Tab Pd_Pj_Product_Cost_Tab
Project_Product_Costed_Op_Tab Pd_Pj_Product_Costed_Op_Tab
Project_Product_Info_Tab Pd_Pj_Product_Info_Tab
Project_Product_Journal_Tab Pd_Pj_Product_Journal_Tab
Project_Product_Operation_Tab Pd_Pj_Product_Operation_Tab
Project_Product_Structure_Tab Pd_Pj_Product_Structure_Tab
Project_Spare_Tab Pd_Pj_Spare_Tab
Project_Tag_Tab Pd_Pj_Tag_Tab
Project_Technical_Calc_Tab Pd_Pj_Technical_Calc_Tab
Project_Temp_Structure_Tab Pd_Pj_Temp_Structure_Tab
Temp_Pdmpro_Cost_Element_Tab Pd_Temp_Cost_Element_Tab